Quick Answer: Work back from the week you want shoes on the shelf, not from the season name. Allow the 25-35 day production window after deposit and sample approval, then add sampling, print or mould setup, packing, booking and the sea leg in front of it. MOQ is 600 pairs per colour and a carton holds 30 pairs. The binding date is when the approved sample and the deposit are both in place.

In this guide:

What a Buying Calendar Actually Measures

A buying calendar measures elapsed time between a decision and a shelf, not the weather. Most buyers open with a season name, spring, back to school, or the holidays, and then ask a factory how fast it can produce. That framing already loses the launch. What has to be measured is the whole chain: sample approval, material and mould preparation, production, packing, space booking, the sea leg, clearance and inland delivery. Only one of those steps has a published duration. We work on FOB Xiamen or EXW, so the calendar must state which party owns each remaining step.

Work Back From the Shelf Date

Start with one dated line in the specification: the week the range must reach shoppers. Everything else is subtracted from it, in four steps:

  1. Set the shelf week and subtract your clearance, inland delivery and receiving time; what remains is the latest arrival date you can accept.
  2. Subtract the sea leg and the booking cut-off for that lane; the remainder is the latest handover date to the carrier.
  3. Subtract packing and the 25-35 day production window, which starts only after the deposit and the approved sample are both in place.
  4. Subtract sampling, artwork, colour chip and print or mould setup; the date left at the front is the day the first decision must be made.

That last date, not the season, is your real order date. Send it to our team with the shelf week and we will name the front steps your artwork needs.

The Critical Path Is Approval, Not Production

On a first order the longest wait is rarely the moulding machine. It is the loop of sample, comment, revision and sign-off, covering the colour standard, print position, size run and packing marks. A buyer cannot shorten the production window, fixed at 25-35 days after the two triggers, but can shorten the approval loop by sending one consolidated specification instead of five emails that each restart a sample round. So a buyer who orders earlier but approves slowly may ship later than one who orders later with a complete, signed sample card. Treat the approval date as a managed milestone with an owner on both sides.

What the 25-35 Day Window Covers

Our published lead time is 25-35 days, and its two boundaries matter. It begins after the deposit is confirmed and the sample is approved, not when an inquiry arrives or a purchase order is drafted. It ends when goods are packed, one pair per polybag and 30 pairs per outer carton, and ready for the carrier. It excludes sampling, tooling, print setup, sea transport, clearance and warehouse delivery. Reading the window as a door-to-door promise is the single most common cause of a missed shelf week. Write the trigger events into the proforma invoice so both parties count from the same day, and read the responsibility split in your delivery term before deciding who books space.

The Work That Sits Before the Clock Starts

Several tasks must be complete before day one of the window, and they differ by style. A repeat of a one-piece injection EVA clog in an existing mould needs a colour standard, a size run and a packing mark, and little else. A new shape needs a mould; custom printing needs screens and an approved strike-off; a lined indoor style needs the lining and footbed signed off as a physical sample. Each of those is a separate approval loop with its own sample card. None of them appears inside the 25-35 days. Our line has run for 12 years across more than 60 countries with over 500 SKUs, and the schedule is gated by the slowest front-end approval, not by the injection cycle. Ask which loops apply to your artwork before you fix any date.

Seven Series Across One Buying Year

The calendar also decides what to buy. We group the range into seven series, home-comfort, casual, sports, boots, fashion, kids and business, and they do not share a single season. Indoor styles sell year-round and peak before colder months; casual clogs and sandals are front-loaded ahead of warm weather; boots and lined styles are decided while the previous cold season still sells; kids styles follow school calendars and the 24-29 and 30-35 size splits. Choosing one launch week for all seven forces the earliest series to wait for the latest artwork. A first range usually works better with two or three series on different shelf weeks, starting with a moulded casual clog that approves quickly and repeats cleanly. Keep a dated line for each series.

Three Ways Buyers Set an Order Date

Read the table as a comparison of decision quality, not of duration.

QuestionSeason-name methodShelf-date backward method
Starting pointA label such as spring or holidaysA dated week the range must be on the shelf
Where the order date comes fromHabit or last year's habitSubtracting every step from the shelf week
What triggers productionAssumed to be the purchase orderDeposit plus approved sample, both in writing
How artwork delays are handledDiscovered late, as a rushVisible as a dated front-end milestone
Fit for a mixed trial orderOne date for all stylesOne dated line per series and colourway
Result of a late print approvalLaunch slips into the next seasonEarlier steps are re-cut or the range is split

How We Plan This Run From the Factory Side

Once the sample card is signed and the deposit is confirmed, we lock material, reserve the moulding slot and prepare any print screens, then pack to one pair per polybag and 30 pairs per outer carton and split the packing list by style and colourway. The calculation on the workshop plan is counting, not money. Three styles at MOQ 600 pairs per colour give 1,800 pairs, filling 60 cartons at 30 pairs each and one mixed container; the plan records sequence, colour, size split and carton marks so documents match the boxes. No amount is entered on it. The published window then runs 25-35 days from those two triggers on FOB Xiamen or EXW.

Mixed Containers and the First Trial Order

Mixed containers are routine, and a first order commonly combines two or three styles to test a market rather than commit a whole range to one prediction. Each style keeps its own dated line and approval loop, but they share one container and one booking cut-off. MOQ is 600 pairs per colour, so a moulded EVA clog, a lined indoor mule and a printed kids boot can travel together while keeping separate specification lines. Confirm size runs in writing, including the 24-29 and 30-35 kids ranges, so carton marks, packing list and inspection description agree.

Booking, Packing and the Shipping Handoff

The last hidden block is the handoff. Carton count and carton dimensions decide how much space is booked, and they are only reliable once the packing list is split by style and colourway; our packing guide explains why those measurements matter to the carrier. Under the agreed delivery term, the party that books space owns the booking cut-off, so put that date on the calendar. We issue the specification, packing list and commercial invoice; carriers and brokers issue the rest. With one pair per polybag and 30 pairs per carton, carton and invoice numbers should match before release.

Where Buyers Get This Wrong

The recurring errors are about dates, not about shoes:

  • Quoting the season name instead of a dated shelf week, so no one can tell whether the plan is early or late.
  • Counting the 25-35 days as door-to-door and omitting sampling, tooling, booking and the sea leg.
  • Letting a colour chip, print strike-off or size split drift through several sample rounds while the deposit waits.
  • Forcing one launch week onto seven series, so the earliest artwork is held hostage by the slowest.
  • Skipping a written trigger for the deposit and the approved sample, then discovering both parties counted from different days.

Each is avoidable with one dated specification and one reviewed backward plan.

FAQ

When should I place a footwear order for a given season?

Start from the week the range must be on the shelf and subtract clearance, inland delivery, the sea leg, the booking cut-off, packing and the 25-35 day production window, then subtract sampling and any print or mould setup. The date remaining at the front is your order date.

What starts the 25-35 day lead time?

Two events, both in writing: the deposit is confirmed and the sample is approved. Before those, material and a moulding slot are not reserved. Agree the trigger in the proforma invoice so the window is counted from the same day by both parties.

Can a first order mix styles and series?

Yes. A trial order commonly combines two or three styles in one mixed container while keeping MOQ 600 pairs per colour. Give each style a dated line and split the packing list by style and colourway. Confirm kids size runs of 24-29 and 30-35 in writing.

Does a new mould change the calendar?

It adds a front-end approval loop before the production window, not time inside it. A repeat in an existing mould needs a colour standard and a size run; a new shape needs the mould, and custom printing needs screens and an approved strike-off.

Do you provide a standard buying calendar document?

No universal buying calendar exists to hand over, and we do not claim any certification on this page. What we can supply is a dated backward plan built from your target shelf week, the specification, the packing list and the commercial invoice.

Send the artwork and your target retail price and we will come back with a mould, a print method and a landed cost.